C921 – MRT Downtown Line Stage 2 Rochor & Little India
ATS supported its partner, Ssangyong, to overcome major challenges which include:
- Construction in the heavily built up locality of Serangoon.
- Construction along main arterial roads – The southbound carriageways of Bukit Timah Road into Sungei Road.
- Ensuring the safety of the public and to minimise disruptions and inconveniences to road users and pedestrians given the close proximity of the project site to the arterial roads.
- Maintaining all 5-lanes carriageway both bounds fully operational at all times
Scope of work:
• Road Diversion Works
• Road & Drainage Works
• External Works
• Earthworks